Auditing clauses 7.1 to 7.3: planning, customer requirements and design control

ISO 13485:2016 clauses 7.1, 7.2.1 to 7.2.3 and 7.3.1 to 7.3.10, with ISO 14971 and IEC 62366-1 links

What you will learn

Key takeaways

Free practice question

Brindle Medical's design plan DP-07 revision 1 lists two stages: concept and design. The pump has use-related risks in a hospital night setting. Transfer to production and usability validation appear nowhere in the plan, although both took place later.

What is the best audit conclusion under clause 7.3.2?

Conforming, because the design stages were planned.

Not quite. Clause 7.3.2 requires verification, validation and transfer activities to be planned for each stage, so design stages alone are not enough.

A nonconformity: the plan does not cover verification, validation and design transfer activities.

Correct. Clause 7.3.2 requires planning of these activities, and unplanned validation for a pump with use-related risks is significant.

An observation only, because the activities took place later.

Not quite. Activities performed without a plan still fail the planning requirement of clause 7.3.2, which exists to define owners and records beforehand.

A nonconformity against clause 7.2.3, communication.

Not quite. Clause 7.2.3 concerns customer communication arrangements and has no bearing on whether the design plan covers all stages.

Key terms

Official sources

Go further

The full lesson has narrated slides, more scenario questions with explained answers and a simulation.

Open the AcademyWatch on YouTube

Illustrative example. Educational only, not legal advice.