Smart QA Academy  All lessons

ISO 13485 · Medium · 12 min lesson

Compiling the batch record - line clearance, in-process checks, deviations, nonconforming product, release and electronic records

ISO 13485:2016 clauses 4.1.6, 4.2.5, 7.5.1, 7.5.5, 7.6, 8.2.6 and 8.3; 21 CFR 820.45 and 820.35 (QMSR); 21 CFR 11.10

What you will learn

Key takeaways

Free practice question

The packing record of lot 2431 shows line clearance signed at 11:30. The first carton is dated 09:10 on the same record. The supervisor says the line was clean anyway.

How should an auditor assess this?

The control against mix-ups was not shown, because clearance after start cannot prevent a mix-up.

Correct. Section 820.45 and clause 7.5.1 require labeling operations that prevent mix-ups, so clearance must precede production.

Acceptable because the supervisor says the line was clean.

Not quite. A verbal assurance is not a record, and clause 4.2.5 requires documented evidence at the time.

Acceptable if the lot passed final inspection.

Not quite. Final inspection does not replace a preventive clearance control required by clause 7.5.1.

Only a spelling issue in the time field.

Not quite. The sequence of times shows the control was out of order, which is a substantive gap under clause 7.5.1.

Key terms

Official sources

Go further

The full lesson has narrated slides, more scenario questions with explained answers and a simulation.

Open the AcademyWatch on YouTube

Illustrative example. Educational only, not legal advice.