When and why to validate - clauses 7.5.6 and 4.1.6, the GHTF decision tree and the validation master plan

ISO 13485:2016 clauses 7.5.6, 7.5.7 and 4.1.6, GHTF SG3 N99-10 (2004, 2nd edition) sections 2, 3, 5.1 and 6

What you will learn

Key takeaways

Free practice question

Lumora bonds catheter hubs with a UV-cured adhesive. Bond strength can only be measured by a pull test that breaks the bond. Today the plant pull-tests five hubs per lot and releases the lot if all five pass. A new engineer asks whether the bonding process needs validation.

What does clause 7.5.6 require?

No validation: five pull tests per lot are verification and are enough.

Not quite. Five tests verify five hubs only; clause 7.5.6 still applies to the rest, and GHTF section 3.1 step A says validate.

Validate only if a customer complaint occurs.

Not quite. Clause 7.5.6 is preventive and applies when output cannot be verified, so waiting for complaints contradicts GHTF section 3.1.

Validate the bonding process, because the output cannot be fully verified and weak bonds would show only in use.

Correct. Clause 7.5.6 requires validation where output is not verified and deficiencies appear after use; GHTF section 3.1 step A leads to step D.

Replace the pull test with a visual check of every hub.

Not quite. A visual look cannot measure bond strength, so the requirement stays unverified under clause 7.5.6 and GHTF section 3.1.

Key terms

Official sources

Go further

The full lesson has narrated slides, more scenario questions with explained answers and a simulation.

Open the AcademyWatch on YouTube

Illustrative example. Educational only, not legal advice.